Historical features

Granite spur stone and conglomerate spur stone - arcade pillar
Granite spur stone and conglomerate spur stone - arcade pillar
Granite spur stone - arcade pillar
Shop display cabinet with roller blind
Ceiling beams and joists - maashaus
Ceiling beams and joists - chamber
Granite spur stone - arcade pillar
Shop display cabinet with roller blind
Ceiling beams and joists with folded decking and clawsCeiling beams and joists with folded decking and clawsCeiling beams and joists with folded decking and clawsHistoric plaster surfaces - living room, hall, pantryHistoric plaster surfaces - living room, hall, pantryLightening belt - living roomSegmental vaulted window lintel - living roomDoor frame, disassembled leaves31/31 cm cemented sintered pavement laid diagonally with 15.5 cm skirting - hallPantry box in a niche without leaves - sculleryPantry box in a niche without leaves - sculleryDoor leaf with divided panel, glass dividersBrick stair steps, planking treadsBrick stair steps, planking treadsStair steps with contoured risers - 1 pc graniteStair steps with contoured risers - 8+11 pc graniteDoor with timber door frame, leaf with divided panelPanelled door to the attic with rim lock and cast handle

2008 reconstruction

House as it looked after 1990House as it looked after 1990House roof as it looked after 1990Entrance hallCourtyardMain staircaseRenaissance living roomRooms on the 2nd floor3rd floor Renaissance ceiling from aboveNew floors on the 2nd floorNew room layoutCourtyard surface original so far.Transformation of the terrace into a meeting roomModern-day roof is taken down. It will be new and betterMaterial put upFirstly the floor will be laid in the atticThen the carpenters will come inThe heating and cooling will have to be thought about soonThe cooling distribution lines will be hidden from viewThe original staircase vaulting will remain Main staircase being repairedIt can now be seen where things will beThe Renaissance living room without a ceiling, however already with new plasterThe new ceiling is already finishedThe supply mains are appearingArchaeologists are overseeing the excavation workThe demands are high, solutions difficultThe original Renaissance ceiling has been savedThere is only a little missing of the Renaissance roomHowever the restoration of the display cabinet will still take timeToday a cellar laundry, tomorrow a language classroomThe toilets will finally acquire their final lookSomewhere there is only a little work left to doBut elsewhere there is still a lot to doThe view from the former terrace. A fire window is a requirementSpacious office on the 3rd floorGas heating dormant so farThe facade is being restored to its historic coloursSo far it is modestly concealed from the view of the Black TowerTo be revealed in all its beautyThe walls in the courtyard are also receiving a new coatThe walls in the courtyard are also receiving a new coatThe walls in the courtyard are also receiving a new coatThe walls in the courtyard are also receiving a new coatA joy to seeThe interior is being enhanced by new floor surfacesThe interior is being enhanced by new floor surfaces - paving tilesThe interior is being enhanced by new floor surfaces - laminate flooringThe interior is being enhanced by new floor surfaces - carpetsThe interior is being enhanced by new floor surfaces - industrial mosaic tilesWork is also taking place in the passageway.The damp columns of the arcade require treatmentThere is still an awful lot of material to get throughThe place for the new kitchen has been preparedThe cellar classroom is still being builtReady on the first floor - red classroomReady on the first floor - orange classroomThe staircase into the blue classroom is just appearingThe staircase into the blue classroom is just appearingView from the landing on the 4th floorView from the landing on the 4th floor The electricians are finishing offThe electricians are finishing offThe water engineers are finishing offThe new house gate is appearingThe new house gate is appearingThe new house gate is appearingThe office in the new atticThe new look of the main staircaseTime has passed, Christmas is comingThe floor of the Renaissance room needed a lot of work.So it could then be admiredIn the reception on the 3rd floor the wallpaperers left their markAnd specialists making the metal staircasesThe paving tiles in the courtyard are ready to be laidThe paving tiles in the courtyard are ready to be laidWork is also taking place in the passagewayWork is also taking place in the passagewayThe blacksmith has also come into his ownThe doors have arrivedThe railings have arrivedAnd the aerials have arrivedThe cleaning has begunThe new gate will be hung hereThe cleaning has begunThe new gate will be hung here

Shop display cabinet

Renaissance ceiling

Interiors today

Miscellaneous